Gable
Mini Gable
The smallest gable we build, sized for compact storage and yards where a delivery trailer would never fit.
Saved starting price $3,300.00 for a 8×12
Based in Athol, Idaho
North Idaho On Site Sheds builds storage sheds, workshops, garages, offices, and specialty outbuildings right where they will stay. No delivery-size ceiling, no compromised layout, no guessing about how the building will fit a real lot in North Idaho — and every project is planned for 40–60+ psf snow load and 24-inch frost depth.

Why on-site matters here
Sized to the actual lot
Prefab sheds ship whatever fits on the truck. NIOS builds on your lot, so the footprint works with your access points, setbacks, tree lines, and slopes instead of a factory default.
Engineered for Idaho winters
Every build meets 40–60+ psf snow loads and 24" frost depth. Roof pitch, framing, and foundations are matched to your specific location — not a factory default.
Built around how you'll use it
Workshop bench space. She-shed comfort. Livestock gear access. The interior layout starts with function, not leftover floorplan from a catalog.
Or call Justice at (208) 699-6079
Our buildings
Compare the core shed types first, then customize size, access, doors, windows, and finish around your site.

Flagship service area
Building on-site means we reach the lakefront, sloped, and tree-lined Coeur d'Alene lots prefab delivery can't — with framing built for North Idaho winters.
Why homeowners choose NIOS
No delivery route bottlenecks, crane access issues, or prefab size limits. The building is framed where it will live.
Layouts and rooflines are planned for North Idaho conditions, including 40-60+ psf snow load requirements.
From straight storage to workshops, garages, offices, livestock support, and specialty lifestyle builds.
Based in Athol and serving five North Idaho counties with practical guidance on placement, access, and site prep.
Popular services
These are the most requested North Idaho builds, from straight storage and workshop space to finished backyard rooms and custom layouts.

Core Shed Types
Workshop sheds built on-site in North Idaho with bench-first layouts, wide access, ventilation, power planning, storage zones, and snow-ready materials.
View service
Core Shed Types
Create a backyard she shed for crafts, gardening, quiet work, or retreat space with North Idaho-ready doors, windows, storage, and site prep.
View service
Core Shed Types
Create a quiet backyard office shed with daylight, privacy, finish planning, power routing, and a site plan for North Idaho weather.
View service
Wellness & Fitness
Custom sauna sheds built on-site in North Idaho with practical planning for bench layout, ventilation, weather protection, privacy, and year-round access.
View service
Core Shed Types
Plan a garage-style shed with wide access, practical storage, workbench options, and a site approach built for North Idaho weather.
View servicePopular sizes
Compact backyard storage through workshop-ready layouts — pick a footprint to see how it sits on a North Idaho lot.
Planning library
Search by topic, format, or related service so planning content turns into a clearer shed decision.
Service areas
NIOS builds across 21 communities, with the most demand coming from Coeur d’Alene, Post Falls, Hayden, Athol, Sandpoint, Priest River, Bonners Ferry, Silver Valley, St. Maries, and Plummer.
North Idaho On Site Sheds serves Kootenai, Bonner, Boundary, Shoshone, and Benewah counties across 21 communities. Each county on the map below links to its service-area details.
Browse every Kootenai, Bonner, Boundary, Shoshone, and Benewah community NIOS serves.
How it works
The goal is simple: figure out what the building needs to do, make sure it fits the site, then build it right on your property.
01
Talk through the use case, site access, setbacks, and the kind of building that makes sense for the property.
02
Dial in size, roofline, doors, windows, storage zones, and the snow-ready details needed for your location.
03
NIOS frames the shed on-site so the final structure fits the lot instead of forcing the lot to fit the delivery.
04
You get a finished building that works for real North Idaho storage, work, recreation, or homestead use.
Financing
Financing through Acorn can help compare payment options before you settle on the final size, features, and build schedule.
Financing is offered by Acorn Finance and its lending partners. Checking options does not create a NIOS loan agreement, and final approval, rates, terms, and payment amounts are determined by the lender.
Save the layout you want to revisit.
Check offers through Acorn in a separate tab.
Use the payment range when scheduling next steps.
Get in touch
Call Justice Owens at (208) 699-6079 or request a free estimate. Tell us what the building needs to do, where it needs to sit, and how you want it to look.
Based in Athol, ID — serving Kootenai, Bonner, Boundary, Shoshone, and Benewah counties.